Portal by PermitsPros
Furnace Hotline

Furnace acting up? The permit gets filed before the cold hits.

Call the hotline. The installer arrives, you approve the proposal on your phone, and the $125 furnace permit is filed from the job site — same day. Then one inspection. Done.

Water heater died instead? The Water Heater Hotline files those the same way. A/C died in the heat? The A/C Hotline files those too. Panel giving up in the rain? The Panel Hotline files panel upgrades the same way.

How the hotline works

  1. Give us the quick details — a dead furnace, strange smells, no heat: tell us in writing and we route an installer.
  2. Installer arrives and diagnoses — confirms the furnace needs replacement (like-for-like swap).
  3. You get a proposal link by text — scope of work plus the $125 permit filing. City permit fees are separate and always paid by you, never us.
  4. Tap Approve on your phone — one tap, timestamped. No paperwork, no printer.
  5. Permit filed on the spot — the installer opens PermitsPros on their phone and files the furnace permit before or during the install. Filed same-day.
  6. One inspection — we schedule it; the inspector checks venting, the gas line, the condensate drain, and the electrical disconnect. Pass the first time with the checklist below.

Pricing

$125 flat — permit filing service

City permit fees are separate and paid by the client (owner, HOA, or insurer) directly to the city — or advanced under our Upfront program where it applies. We never add surprise charges. Filing is not approval or issuance — no one can promise those.

From buying it to sign-off — one door.

1Pick your furnace

Tell Tony your home size and fuel type — or just bring the one you already bought.

2Permit pulled first

$125, filed before the install starts.

3Matched with a licensed HVAC installer

Free match. We connect owners with licensed local HVAC pros — no lead fees, nobody pays for the introduction.

4Installed

The licensed pro does the install; the permit is already in hand.

5Inspection scheduled

We book it and run it to the inspector's visit.

6Signed off

Inspection passed, folder closed: Project Complete.

New furnace, permitting, installing, inspecting — one call to Tony runs the whole chain. Permits included.

Just need the permit? That works too — $125, filed the same day, no chain required.

For installers

File a furnace permit from the job site in about three minutes — big buttons, camera-first photos, works one-handed.

  • Address + unit, with location assist
  • Three photos: old furnace, data plate, install location
  • Your name + license number, pay $125, filed

Open field mode

Need the owner or HOA to approve first? Generate a proposal link below and text it to them.

For property managers, HOAs & insurers

One hotline number for every dead furnace across the portfolio. Approve proposals from your phone; we handle the filing and the inspection.

  • Proposal links for fast approvals
  • 10+ properties? Bulk filing at /bulk/ — 10% off
  • One inspection per swap, scheduled for you

Give us the quick details

Generate a proposal link

Installers: fill this in at the job site, then text the link to whoever approves — owner, HOA, or insurer. They tap Approve; you get the green light to file.

The one inspection — pass it first time

Like-for-like furnace swaps typically need a single final inspection in most California cities. Here's what the inspector checks:

  • Venting — flue connector secure, proper rise, terminated correctly
  • Gas line — shutoff valve accessible, connections tight, no leaks
  • Condensate — drain line run to an approved termination
  • Electrical — disconnect within sight of the unit

Requirements vary by city — this covers what most California inspectors check on a straight swap.

Questions

Is it really just one inspection?

Typically, yes — a like-for-like furnace swap gets a single final inspection in most California cities. Some jurisdictions differ, and we'll tell you upfront if yours does.Filed same-day; city fees separate; we never promise approval or inspection outcomes.

How fast is the permit filed?

Same day — the installer files from the job site before or during the install. You don't wait for an office to open.Filed same-day; city fees separate; we never promise approval or issuance timelines.

Who pays the city permit fee?

The client — the property owner, HOA, or insurer — pays the city's fee directly to the city. Our $125 covers the filing service only. Where our Upfront program applies, we can advance the fee instead.Filed same-day; city fees separate; we never promise approval.

What if it's not like-for-like — say, adding AC or moving the furnace?

That's a different permit path (often mechanical/electrical scope). Call the hotline and we'll quote it in writing before anything is filed.Filed same-day; city fees separate; we never promise approval.

Do I need to be home for the inspection?

Someone 18 or older needs to give the inspector access to the furnace. We'll schedule it with you.Filed same-day; city fees separate; we never promise inspection outcomes.