P PermitsPros
Before you file, know what the ground demands

Hazard & Flood Zone Report

Some projects sail through plan check. Others get stopped cold by a report nobody mentioned — a geologic report, a floodplain review, a fault investigation. Owners used to pay the city just to find out whether one was needed, then wait. This report answers it up front, for your parcel and your scope, from the same public maps the reviewers use.

What it checks

Flood zoneFEMA flood maps: is the parcel in a Special Flood Hazard Area? Floodplain review and an Elevation Certificate may ride on the answer.
Liquefaction & landslideCalifornia Geological Survey zones of required investigation — inside one, ground-disturbing work generally needs a geologic report first.
Alquist-Priolo fault zonesInside a state fault zone, new structures need a fault investigation and setbacks from active traces — before the drawings, not after.
Fire hazard severityCAL FIRE severity zones: High and Very High parcels carry Chapter 7A construction and defensible-space documentation.

Every finding names its map layer and source. If a layer can't be checked from public data, the report says “not determined” — never a guess dressed up as an answer.

What a finding looks like

Liquefaction zone (CGS)
Inside a CGS liquefaction zone of required investigation
Review likely required

Sample: a geologic/geotechnical report, prepared by a licensed geologist and reviewed by the city, is generally required before permits issue — and the report's foundation recommendations belong in the drawings.

Source: California Geological Survey (CGS) Seismic Hazards Program

Flood zone (FEMA)
Minimal flood hazard — FEMA Zone X
Clear

Sample: the parcel maps outside the Special Flood Hazard Area in FEMA's current data, so no flood review step is expected for the stated scope.

Source: FEMA National Flood Hazard Layer (NFHL)

The honest part

This is a fast advisory determination from public parcel data — the same layers reviewers start from. Where a city's own determination letter is the binding one, your report says so plainly, and the follow-on service is simple: we route the official request for you, then file the permit with whatever reports the determination requires.

Get your report

Zone Check
$49 one-time
Layer readout + a required / not-required answer for every hazard layer, for one parcel and scope.
Full Report
$99 one-time
The full determination: findings with published city fees, the reviewing agency for each item, exemption screens, and the routing plan for any official request still required.

Invoice emailed — no card needed to start.

How it works: we capture your request, run the parcel against the public hazard layers immediately, and email your invoice. Reports are advisory determinations from public data — not a guarantee of any city's ruling. Questions? Call or text (888) 907-9511.