How it works
- Talk to Tony — your address and what's changing: walls moving, plumbing or electrical moving, a bathroom added. About a minute.
- We check your city's rules — what your city requires for this scope: forms, plans, and which trades ride on the permit.
- You approve — the scope and our filing fee in writing before anything is filed. City permit fees are separate and always paid by you, never us.
- Filed same day — the whole package goes in as one submittal, not drips and drabs.
- Corrections handled — if the city comes back with comments, we work them with you and your contractor the hour they land.
- Inspections scheduled — rough and final inspections booked as the work reaches each stage, through final sign-off.
What Tony needs from you
- The address — and which rooms or areas are changing
- The scope in plain words — walls, plumbing, electrical, windows, layout changes
- Plans, if you have them — no plans yet? Tony tells you exactly what your city requires for your scope
- Your contractor's details — if you've picked one; if not, the permit can still get moving
- Your timeline — demo day and crew dates, so filings and inspections land ahead of them, never behind
We are a permit service — we never do the construction, design, or engineering. Your contractor builds; we make it legal and keep it moving.
Hey — wanna know how much it'll cost you?
- Our permit fee — priced by scope. Tony quotes it in the talk, in writing, before anything is filed.
- City fees — at cost, set by your city and paid to your city. We never mark them up.
- Inspection fees — set by your city and never marked up by us; overtime (after-hours) inspection, when a job needs it, is priced by the city too.
- The remodel itself — typical pro average runs roughly $30,000–$100,000+ depending on rooms and finishes. For planning, not a quote — your contractor prices your actual job.
Just browsing? Start with the talk — the quote for our part costs nothing and takes about a minute.
Permit expediters are here to save money and save time.
The old way
- Print the forms, drive to the counter
- Business hours only — your crew waits
- Corrections arrive by mail, weeks apart
- Inspections? You book them, you chase them
The Tony way
- Talk to Tony — one conversation, about a minute
- 24/7 — even the Saturday the dumpster lands
- Filed same day — corrections worked the hour they land
- Permit in hand — inspections scheduled for you
- Filed online, even on a weekend — no waiting for Monday
Questions
Are you a contractor? Are you an installer?
No — we're permit expediters. We pull the paper: the permit, the filing, the inspection scheduling. Licensed contractors do the building; we get their work permitted and signed off.Permits only — that's the whole point of us.
What is a home remodel permit?
It's the city's approval that makes the remodel legal — filed before the first wall comes down, inspected as the work goes, so your home, your insurance, and a future resale all stay clean.Filed same-day; city fees separate; we never promise approval.
Does my remodel actually need a permit?
Cosmetic work — paint, flooring, like-for-like cabinets — usually doesn't. Moving or removing walls, touching plumbing, electrical, or mechanical systems, or changing the layout almost always does. Tell Tony the scope and he'll tell you straight, before you spend anything.Rules vary by city; we check yours before filing.
How fast is the permit filed?
Same day — and pulled first, before the work starts, so your crew is never standing around waiting on paperwork or, worse, working unpermitted.Filed same-day; city fees separate; we never promise approval or issuance timelines — the city decides those.
Who pays the city permit fee?
You do — the homeowner pays the city's fee directly to the city. Our fee covers the filing service only, quoted in writing before we file.Filed same-day; city fees separate; we never promise approval.
Do you do the remodeling?
No — and we won't pretend to. PermitsPros is a permit service: we pull the permit, work the corrections, and schedule the inspections. Your licensed contractor does the building.Permits only — that's the whole point of us.
We already started without a permit. Too late?
Not necessarily. Many cities have a path to permit work already done — it starts with an honest look at what was built. Talk to Tony and we'll tell you what your city is likely to require before you commit to anything.The city decides every legalization case; we never promise an outcome.
