Portal by PermitsPros
Kitchen & Bath Permits

Kitchen or bathroom remodel? One permit package covers the whole job.

A kitchen or bath remodel usually rides on several trades at once — building, electrical, plumbing, sometimes mechanical. Filing them piecemeal is how jobs stall. We file the whole package together, same day, and schedule the rough and final inspections as your crew reaches each stage.

Remodeling your kitchen or bath? Let us pull your permit and schedule your inspections.

Filed same day

Open now — Tony takes projects 24/7. Bigger job than one room? See Home Remodel Permits. Just the electrical? See Electrical Permits.

Kitchen and bathroom remodel permit
Get your permit first — before the work starts 1 Permit → 2 Remodel → 3 Inspection

How it works

  1. Talk to Tony — the room, the address, and what's moving: sink, stove, shower, circuits, walls.
  2. We map the trades — which permits your city wants for this scope, filed as one package instead of a permit here and a permit there.
  3. You approve — scope and our filing fee in writing first. City permit fees are separate and always paid by you, never us.
  4. Filed same day — one complete submittal, pulled before the work starts.
  5. Corrections handled — city comments come to us; we work them with you and your contractor right away.
  6. Inspections scheduled — rough inspections before the walls close, finals at the end, through sign-off.

What usually rides on a kitchen or bath permit

  • Building — layout changes, walls, windows, structural touches
  • Electrical — new circuits, relocated outlets, lighting, GFCI protection
  • Plumbing — moved sinks, showers, tubs, and water heaters
  • Mechanical — range hoods, bath fans, and duct changes where your city requires them
  • The rough-in sequence — rough inspections timed before the walls close, so nothing ever gets reopened for an inspector

Every city's list is a little different — we check yours before filing so the package is complete the first time. We are a permit service: your contractor does the work; we do the permitting.

Hey — wanna know how much it'll cost you?

  • Our permit fee — priced by scope. Tony quotes it in the talk, in writing, before anything is filed.
  • City fees — at cost, set by your city and paid to your city. We never mark them up.
  • Inspection fees — set by your city and never marked up by us; overtime (after-hours) inspection, when a job needs it, is priced by the city too.
  • The remodel itself — typical pro averages run about $15,000–$45,000 for a kitchen and $8,000–$25,000 for a bathroom. For planning, not a quote — your contractor prices your actual job.

Just browsing? Start with the talk — the quote for our part costs nothing and takes about a minute.

Permit expediters are here to save money and save time.

The scene: cabinets arrive Friday, the countertop template is booked — and three different trades are each waiting on a permit nobody filed.

The old way

  • One permit run per trade — three trips, three lines
  • Forms and counters, business hours only
  • A missed rough inspection and the walls just wait
  • Corrections arrive by mail, weeks apart

The Tony way

  • One package — every trade filed together
  • Talk to Tony now — 24/7, no forms to print
  • Filed same day — before the work starts
  • Rough and final inspections scheduled as the crew reaches each stage
  • Filed online, even on a weekend — no waiting for Monday

Questions

Are you a contractor? Are you an installer?

No — we're permit expediters. We pull the paper: the permit, the filing, the inspection scheduling. Licensed pros do the remodel work; we get their work permitted and signed off.Permits only — that's the whole point of us.

What is a kitchen or bathroom remodel permit?

It's the city's approval that makes the remodel legal — filed before the work starts, inspected at rough-in and final, so your home, your insurance, and a future resale all stay clean.Filed same-day; city fees separate; we never promise approval.

I'm only swapping cabinets and counters. Do I need a permit?

Like-for-like cosmetic swaps usually don't. The moment plumbing moves, electrical moves, or a wall comes down, a permit almost always enters the picture. Tell Tony the scope — the answer is free and straight.Rules vary by city; we check yours before filing.

Is it one permit or several?

Depends on the city — some issue one combined permit, others want a permit per trade. Either way we file them together as one package on the same day, so nothing waits on a missing piece.Filed same-day; city fees separate; we never promise approval or issuance timelines.

Who pays the city permit fee?

You do — the homeowner pays the city's fees directly to the city. Our fee covers the filing service only, quoted in writing before we file.Filed same-day; city fees separate; we never promise approval.

Do you do the remodel?

No. PermitsPros is a permit service — we pull the permit, work the corrections, and schedule the inspections. Your licensed contractor swings the hammer.Permits only — that's the whole point of us.

When do inspections happen?

Typically a rough inspection for each trade before walls and ceilings close, then finals when the room is done. We book them as your crew hits each stage so the job never idles waiting for an inspector.Inspection outcomes are the inspector's call; we never promise a pass.