Los Angeles · Code Requirements

What Los Angeles Requires for Mag-Locks & Access Control

LADBS on the building side, LAFD plan check on the fire-alarm tie-in — filed in that order. The city's checklist, in plain English.

Order the permit — $495/siteCheck my city — free

The permit, first

Los Angeles runs access control on two tracks. The hardware rides an LADBS building/electrical permit. Because an egress mag-lock ties into the fire alarm, the tie-in pulls an LAFD Fire Development Services plan check: "fire alarm tenant improvements (50 device max)" is a listed LAFD plan check item, priced on LAFD's Division 15 fee schedule. This page covers that fire-alarm-interfaced case.

The order of filing is not a detail — it is the process. LAFD's fire/life-safety plan check requires a copy of the LADBS permit application and its clearance summary sheet: the fire filing cannot precede the LADBS filing. And an LAFD application is not screened until the plans are received — the application and the plans go in together, at minimum a site/plot plan, equipment plans and specifications, and the relevant listing information for the hardware. The building side runs on ePlanLA; the fire side runs on LAFD's own portal, FIMS (inspect.lafd.org), where the fire transaction ID — not the LADBS number — is what schedules fire inspections.

Los Angeles publishes no dedicated mag-lock bulletin for general egress doors; the fire-alarm permit track is the vehicle. The one mag-lock document LAFD does publish — the most specific in California — covers elevator lobbies, below.

The hardware rules CBC §1010.1.9.x

California's electromagnetic-lock section — the §1010.1.9.x family; the exact subsection number shifts with the adopted CBC edition — sets the baseline both reviewers work from:

1Locking hardware is listed — UL 294, and California State Fire Marshal (CSFM) listed.CBC 1010.1.9.x
2The lock is fail-safe — it releases on loss of power.CBC 1010.1.9.x
3The lock releases automatically on fire alarm or sprinkler actuation.CBC 1010.1.9.x
4A manual release device at the door, independent of the electronics.CBC 1010.1.9.x
5Required signage at the door, as the section prescribes.CBC 1010.1.9.x

On the general track, the fire-alarm permit submittal covers the lock-release interface, and the LADBS permit carries the hardware schedule — the listing sheets are part of both conversations.

Elevator lobby doors are their own track LAFD — LOCKING OF ELEVATOR LOBBY DOORS

Locking an elevator lobby door in Los Angeles is not a line item on the general permit — it is an approval-letter process with LAFD's Fire Prevention Bureau, Construction Services Unit, run concurrently with an LADBS modification. The submittal is a request letter (building name and address, floor, and the method — A, B, or C), the entire floor plan showing the work and all floor exits, the manufacturer's spec sheet and a current CSFM listing sheet for the locking device, and — where a fire-rated assembly has to be drilled — a door/frame manufacturer's certification letter.

The requirements the approval runs against:

1Locks are UL and CSFM listed, and fail-safe.LAFD
2The doors release automatically on activation of any fire alarm device on the floor.LAFD
3Two-way voice communication is provided.LAFD
4Required signage at the doors, as the approval prescribes.LAFD
5A field inspection within 30 days — a joint inspection by a Building & Safety life/safety electrical inspector and a fire inspector.LAFD

The inspection rides inside the plan check LAFD DIVISION 15

LAFD's Division 15 fee schedule prices the plan review and approval — and the plan-check fee includes up to 2 hours of initial field inspection by LAFD. The fire inspection is not a separate errand bolted on at the end; it is part of the plan-check item you already bought. Elevator-lobby work is stricter: the joint LADBS + fire inspector inspection is explicit.

What the city charges

LAFD publishes its Division 15 fee schedule — plan review and approval are priced there, with the first 2 hours of field inspection inside the plan-check fee. LADBS charges its own permit fees on the building side. We quote city fees from the schedule for your scope at intake and pass every city dollar through at cost, with receipts — our service is the flat fee below, and it does not change.

Close-up of an installed electromagnetic lock

The process, run for you

1

Intake

Send the drawings and hardware cutsheets (or just the drawings; we build the packet). Signed authorization + photo ID.

2

LADBS files first

The building/electrical permit application goes in through ePlanLA — because LAFD's plan check opens with its clearance summary sheet in hand.

3

LAFD plan check

Application and plans together through FIMS — site plan, equipment plans and specs, listing sheets. An application without plans is not screened; ours never travels alone.

4

Permits issue

Both records live — LADBS for the hardware, LAFD for the fire side — and we track the pair while your crew mobilizes.

5

Install

Your crew installs to the approved set. Elevator-lobby job? The approval letter and its conditions ride with the crew, not in a drawer.

6

Field inspection

LAFD's field inspection, scheduled off the fire transaction ID — and for elevator lobbies, the joint LADBS + fire inspection. Signed-off permit delivered.

$495 per site — covers up to 9 entries

One flat number per project, set by how many entries are controlled — quoted up front, never a meter. One corrections round included; additional rounds are $295 each, quoted in writing before we resubmit. City fees at cost, passed through with receipts.

Entries (doors / openings)Service fee
1–9 entries$495
10–24 entries$795
25–49 entries$1,195
50+ entries$1,695

Optional: $195 plan code-review (before filing) · $195+ cutsheet packet built for you — the add-ons stay flat at every tier.

Why it matters

Sequence is the trap

The fire filing cannot precede the LADBS filing, and an application without plans is never screened. Out-of-order filings don't move slower — they don't move.

Egress violations

A door that doesn't meet the CBC lock section is a life-safety finding against the building — and the correction belongs to the owner.

Occupancy delays

Corrections run as resubmittals and re-tests on the city's schedule, not yours — a tenant improvement or a move-in waits on a door.

Installed properly per the fire code, none of this is your problem. That is the whole service.

Filed today. You never left the job.

Send the drawings and cutsheets — or just the drawings. We run the checklist, both filings in the right order, the plan check, and the inspection.

Order the permit — $495/siteCheck my city — free

Sources

LAFD Fire Development Services — Division 15 Fee Schedule (plan review items; plan-check fee includes up to 2 hours of initial field inspection) — lafd.org · LAFD Fire Prevention Bureau — Locking of Elevator Lobby Doors (approval-letter process, Methods A/B/C, joint inspection) — lafd.org · LAFD Fire Development Services — FIMS portal and online plan review submittal guidance (inspect.lafd.org) · LADBS ePlanLA — eplanla.lacity.org · California Building Code §1010.1.9.x (electromagnetic locks). Requirements summarized from the cited sources as of October 2026; the filed permit is reviewed against the code in force for the job.

PermitsPros Comm Inc · City of Concord Business License No. 5027635 · We file permits. We never promise approvals — that's the city's call, and we tell you so up front. Back to Access Control & Mag-Lock Permits.

Filed today. You never left the job.