Real work, real doors, real permits
This isn't a form-filling service. We file access-control permits every week — we know which reviewer asks for what, which portal lane moves fastest, and what triggers a correction before it happens.



How the permit runs — six steps
Intake
Send the drawings and hardware cutsheets (or just the drawings; we build the packet). Signed authorization + photo ID, same letter-first intake as every PermitsPros order.
Plans & cutsheets
We check the set against the egress rules before anyone files: sensor release, push-to-exit placement, fail-safe behavior, UL listings.
SFFD review
Fire plan check on the life-safety side: the locks' release on alarm is the review.
DBI job card
The permit issues with the DBI job card; the card is the job's record on site.
Install
Your crew installs to the approved set; we track the record while you work.
Final test
The fire-alarm final test is scheduled and coordinated; locks release on alarm, witnessed. Signed-off permit delivered.
Anatomy of a compliant door
Five things San Francisco's code looks for on a sensor-release egress door. Each one is a line item at review — and at the final test.
- 1Mag-lock — fail-safe. Loss of power to the lock unlocks the door. The rule →
- 2Egress-side motion sensor. Detects an approaching occupant and unlocks the door. The rule →
- 3PUSH TO EXIT button. 40–48 inches above the floor, within 5 feet of the door; it directly interrupts power and keeps the door unlocked at least 30 seconds. The rule →
- 4Fire alarm tie-in. The doors unlock the moment the fire alarm, sprinkler, or detection system activates — and stay unlocked until the system is reset. The rule →
- 5Listed hardware. The locking device is listed to UL 294 or UL 1034. The rule →
Installed vs. installed right
Installed
Hardware on the door, invoice paid, no permit record. First fire inspection or final: egress violation, correction notice, the locks come off or the door stays locked out of service.
Installed right
Permit filed before the work, SFFD + DBI review passed, final test witnessed. The door is an asset at sale, refi, and inspection — not a finding.
The permit is the cheap part of getting caught without one.
What's included — $495/site
- Fire + building department review handled end-to-end
- Plans and cutsheets checked before filing
- Filed same-day through the city's portal
- One corrections round included
- Inspection scheduled and coordinated
- San Francisco jobs: SFFD fire final-test scheduling and coordination included
- City fees at cost — always shown up front
Popular add-ons
- $195 — plan code-review before filing (catch corrections before the city does)
- $195+ — cutsheet packet built for you (UL listings verified)
- Free — mag-lock jurisdiction checker (does your city even need a separate filing?)
Additional corrections rounds are $295 each — quoted in writing before we resubmit, never a surprise.
What it costs — no fine print
PermitsPros
One flat number per project, set by how many entries are controlled — quoted up front, never a meter.
| Entries (doors / openings) | Service fee |
|---|---|
| 1–9 entries | $495 |
| 10–24 entries | $795 |
| 25–49 entries | $1,195 |
| 50+ entries | $1,695 |
- Review handled end to end — plans and cutsheets checked before filing
- One corrections round included
Optional: $195 plan code-review (before filing) · $195+ cutsheet packet built for you — the add-ons stay flat at every tier.
City of San Francisco — at cost
From the city's own published schedule:
- Security-system electrical permit: $320 (up to 10 components), +$52 per additional 10
- Witnessed fire-alarm testing: $519/hour when the city requires it
Every city dollar is passed through with the receipt — never marked up.
Three ways in
We speak your city's language
Houston has a dedicated "Electronic locks" permit. Denver has an Access Control Permit. Chicago needs no separate filing. Nashville wants a notarized registration and a $40K bond before you can even apply. We map every AHJ's portal, signup friction, and rejection quirks before we touch your submittal — 31 metros mapped, 30 of them studied in depth in the October 2026 scan.
Filed today. You never left the job.
That's the whole pitch. One call, one flat price, and your mag-lock permit is moving through the city while you're on to the next install.
Place your permit orderPermitsPros Comm Inc · City of Concord Business License No. 5027635 · We file permits. We never promise approvals — that's the city's call, and we tell you so up front.
