The permit, first
Inside Sacramento city limits, the authority is the City of Sacramento — its Community Development Department on the building side and the Fire Prevention Division (a Development Services unit of the Fire Department) on the fire side. Not Sacramento Metropolitan Fire District — Metro Fire covers the unincorporated county and contract cities, and its standards do not apply inside city limits.
Sacramento publishes no mag-lock-specific bulletin or checklist. What the city does publish is the Fire Prevention Division's scope, in its own words: the Division "provides inspection and plan review of all new, repaired, or replaced fire protection systems requiring a building permit." An egress mag-lock tied into the fire alarm is part of that fire protection system — so the filing is a building permit with Fire Prevention Division review of the fire protection system. This page covers that fire-alarm-interfaced case.
Applications go to the Building Division electronically through the city's Accela Public Permit Portal — the same portal takes building and fire permit applications — and plans move through Electronic Plan Check. One Sacramento rule matters to anyone filing through a desk like ours: the permit holder of record must be the licensed contractor or the property owner, and an authorized agent files only with an authorization letter on file with the Building Division. We put that letter in place before your job files, not after a rejection.
The hardware rules CBC §1010.1.9.x
California's electromagnetic-lock section — the §1010.1.9.x family; the exact subsection number shifts with the adopted CBC edition — sets the baseline the review works from:
Field inspections test the same behavior everywhere in California: normal operation, release on loss of power, release on fire alarm or sprinkler activation, manual release, and egress that stays free with one motion.
The inspections are on the city's schedule — by code number CITY OF SACRAMENTO
Sacramento schedules its fire inspections under published inspection codes, and the access-control case is right there in the list:
What the city charges
Sacramento publishes no mag-lock fee line, and we won't invent one. City fees are quoted from the city's schedule for your scope at intake and passed through at cost, with receipts — our service is the flat fee below, and it does not change.
The process, run for you
Intake
Send the drawings and hardware cutsheets (or just the drawings; we build the packet). Signed authorization + photo ID — and the agent authorization letter goes on file with the Building Division up front.
Plans
We check the set against the CBC lock rules and route the plans through Electronic Plan Check.
Fire Prevention review
The Division reviews the fire protection system — the alarm interface the locks hang on — as part of the building permit.
Permit issues
The building permit issues through the Accela portal; we track the record while your crew mobilizes.
Install
Your crew installs to the approved set.
City fire inspections
The scheduled inspections — 100 FIRE ALARM, 102 BATTERY TEST, 702 GATES/ACCESS, 194 FIRE FINAL — coordinated in order. Signed-off permit delivered.
One flat number per project, set by how many entries are controlled — quoted up front, never a meter. One corrections round included; additional rounds are $295 each, quoted in writing before we resubmit. City fees at cost, passed through with receipts.
| Entries (doors / openings) | Service fee |
|---|---|
| 1–9 entries | $495 |
| 10–24 entries | $795 |
| 25–49 entries | $1,195 |
| 50+ entries | $1,695 |
Optional: $195 plan code-review (before filing) · $195+ cutsheet packet built for you — the add-ons stay flat at every tier.
Why it matters
The codes are on the schedule
Gates/access and fire-final inspections are standing items on the city's schedule. Unpermitted access control doesn't stay invisible — it meets a code number.
Egress violations
A door that doesn't meet the CBC lock section is a life-safety finding against the building — and the correction belongs to the owner.
Occupancy delays
Corrections run as resubmittals and re-tests on the city's schedule, not yours — a tenant improvement or a move-in waits on a door.
Installed properly per the fire code, none of this is your problem. That is the whole service.
Filed today. You never left the job.
Send the drawings and cutsheets — or just the drawings. We run the checklist, the filing, the Division's review, and the inspections.
Order the permit — $495/siteCheck my city — freeSources
City of Sacramento Fire Department — Fire Prevention / New Construction (Division scope: plan review and inspection of fire protection systems; city inspection codes 100, 102, 702, 194) — cityofsacramento.gov · City of Sacramento building permit application instructions (Accela Public Permit Portal; permit holder of record; agent authorization letter) and Electronic Plan Check · City of Sacramento Fire Code amendments · California Building Code §1010.1.9.x (electromagnetic locks). Sacramento publishes no mag-lock-specific bulletin; this page covers the fire-alarm-interfaced case under the Division's published scope, as of October 2026. The filed permit is reviewed against the code in force for the job.
PermitsPros Comm Inc · City of Concord Business License No. 5027635 · We file permits. We never promise approvals — that's the city's call, and we tell you so up front. Back to Access Control & Mag-Lock Permits.
