Portal by PermitsPros  ·  ← Mag-lock permits
Give us the quick details
Installed mag-lock doors with exit hardware
San Jose · Code Requirements

What San Jose Requires for Mag-Locks & Access Control

Two permits, two reviewers — the Building Division on the hardware, the Fire Department on the fire-alarm tie-in. The city's checklist, in plain English.

Order the permit — $495/siteCheck my city — free

The permit, first

Access control in San Jose runs on two tracks. The hardware rides a building permit — the Building Division plan-checks the door hardware schedule. The fire-alarm tie-in rides a San Jose Fire Department fire-protection system permit — filed as a "Fire Alarm System" or "Dedicated Function System" permit with the SJFD Bureau of Fire Prevention. This page covers the egress mag-lock tied into the fire alarm — the case that pulls both tracks.

The SJFD rule is stated up front in its requirements: no installation or alteration before plan approval and permit issuance (SJFD requirements §1.7).

Plans themselves move electronically: SJePlans is the city's plan-review portal (Building, Planning, Fire, and Public Works all review there), and SJPermits.org carries the applications, fees, inspections, and status. Building Division submittal is electronic only — no hard copies. The SJFD fire permit application is its own form, filed with the fees, and it asks for three numbers an out-of-town contractor has to have ready first: a San Jose city business license number, a workers' comp number, and a CSLB license number. Owners link the property to their account by APN and legal owner name before applying.

Mag-locks on doors that are not in the means of egress are a different, smaller filing — the CBC lock rules below apply to egress doors; non-egress hardware files under the building/electrical permit only.

The hardware rules CBC §1010.1.9.x

California's electromagnetic-lock section — the §1010.1.9.x family; the exact subsection number shifts with the adopted CBC edition — sets the baseline every San Jose reviewer works from:

1Locking hardware is listed — UL 294, and California State Fire Marshal (CSFM) listed.CBC 1010.1.9.x
2The lock is fail-safe — it releases on loss of power.CBC 1010.1.9.x
3The lock releases automatically on fire alarm or sprinkler actuation.CBC 1010.1.9.x
4A manual release device at the door, independent of the electronics.CBC 1010.1.9.x
5Required signage at the door, as the section prescribes.CBC 1010.1.9.x

On the plans, that becomes paper: the Building Division wants the door hardware schedule showing the UL 294 / CSFM listing; SJFD wants the full plan set plus a device table — manufacturer, model, CSFM listing number, and quantity for every device on the fire permit application.

Delayed egress is its own rule SJ PLAN REVIEW NOTE #25

San Jose's published note on security doors covers delayed-egress locks — a stricter, separate configuration, not the plain mag-lock rule. Under Plan Review Note #25 (2019 CBC 1010.1.9.8), a delayed-egress path runs through an approved AMMC arrangement with an adjacent compliant exit door, and the lock must auto-unlock on sprinkler or smoke activation, on loss of power, and from a Knox manual release — with emergency lighting on the path. If your door set includes a delayed-egress lock, it is reviewed under this note, not the standard track.

The fire inspection is a witnessed test SJFD REQS §4.0

SJFD does not sign off on paper. Before the inspection, the contractor completes the NFPA 72 Record of Completion and a full system test (SJFD requirements §4.0 / §4.7 / §4.10). At the inspection itself, the inspector witnesses the device testing — the locks' release behavior is demonstrated, not described. And there is no final without the paperwork behind the system: a central-station certificate is required before final approval (§4.12.1).

What the city charges

The SJFD fire permit application is filed with its fees — the permit does not start moving on a promise to pay later. Beyond that, the city does not publish a mag-lock fee line we can quote you here, and we won't invent one: city fees are the city's, billed at cost and passed through with receipts. Our service is the flat fee below — the number that does not change.

Close-up of an installed electromagnetic lock

The process, run for you

1

Intake

Send the drawings and hardware cutsheets (or just the drawings; we build the packet). Signed authorization + photo ID — and we sort the San Jose business license and APN linking before anything files.

2

Plans & device table

We check the set against the CBC lock rules, build the door hardware schedule, and build SJFD's device table — manufacturer, model, CSFM listing number, quantity.

3

Two reviews

Building Division plan check on the hardware; SJFD plan approval on the fire side through SJePlans. Nothing installs before approval — that is §1.7, and we file to it.

4

Permits issue

The building permit and the SJFD fire-protection system permit issue; the record is tracked on SJPermits while your crew mobilizes.

5

Install & full test

Your crew installs to the approved set, completes the NFPA 72 Record of Completion and the full system test, and the central-station certificate is in hand.

6

SJFD inspection

The witnessed device test with SJFD — locks release on alarm and on power loss, demonstrated live. Signed-off permit delivered.

$495 per site — covers up to 9 entries

One flat number per project, set by how many entries are controlled — quoted up front, never a meter. One corrections round included; additional rounds are $295 each, quoted in writing before we resubmit. City fees at cost, passed through with receipts.

Entries (doors / openings)Service fee
1–9 entries$495
10–24 entries$795
25–49 entries$1,195
50+ entries$1,695

Optional: $195 plan code-review (before filing) · $195+ cutsheet packet built for you — the add-ons stay flat at every tier.

Why it matters

Witnessed finals

The SJFD inspection is a live device test. An install that was never reviewed gets measured there — against the approved plans it doesn't have.

Egress violations

A door that doesn't meet the CBC lock section is a life-safety finding against the building — and the correction belongs to the owner.

Occupancy delays

Corrections run as resubmittals and re-tests on the city's schedule, not yours — a tenant improvement or a move-in waits on a door.

Installed properly per the fire code, none of this is your problem. That is the whole service.

Filed today. You never left the job.

Send the drawings and cutsheets — or just the drawings. We run the checklist, both filings, both reviews, and the witnessed inspection.

Order the permit — $495/siteCheck my city — free

Sources

San Jose Fire Department fire-protection system requirements (§1.7 plan approval before installation; §4.0–§4.12 inspection, Record of Completion, and central-station certificate) — sanjoseca.gov · SJFD Fire Protection and Special Systems Permit Application — sanjoseca.gov · San Jose Plan Review Note #25, Security Doors Equipped with Special Delayed Egress Locks — sanjoseca.gov · California Building Code §1010.1.9.x (electromagnetic locks) · City of San Jose SJPermits / SJePlans portal guidance. Requirements summarized from the cited sources as of October 2026; the filed permit is reviewed against the code in force for the job.