Portal by PermitsPros
Electrical Permits

Electrical permit holding up your job? We pull it first.

Panel upgrades, new circuits, service changes, EV chargers — your licensed electrician does the work. We pull the electrical permit before the work starts, filed same day, and schedule the inspection so the job closes out clean.

Need an electrical permit? Let us pull your permit and schedule your inspection.

Filed same day

Open now — Tony takes projects 24/7. Panel upgrade specifically? The Panel Hotline files those the same way. Adding a charger? See EV Charging Permits.

Electrical permit
Get your permit first — before the work starts 1 Permit → 2 Electrical work → 3 Inspection

How it works

  1. Talk to Tony — the address and the electrical scope: panel, circuits, service, charger.
  2. We check your city's rules — what your city wants for this work, and whether the utility needs a heads-up too.
  3. You approve — scope and our filing fee in writing first. City permit fees are separate and always paid by you, never us.
  4. Filed same day — the permit is pulled before your electrician starts, not chased after.
  5. Corrections handled — any city comments come to us and get worked right away.
  6. Inspection scheduled — booked when the work is done, through final sign-off.

Electrical work we pull permits for

  • Panel upgrades — 100-to-200 amp swaps and service upgrades
  • New circuits & rewires — kitchens, baths, additions, remodels
  • EV charger circuits — dedicated 240V runs and load calculations
  • Remodel & tenant-improvement electrical — as part of the bigger package
  • Load details for big adds — EV chargers, hot tubs, and ranges can trigger a load calculation; we flag it before filing, not after a correction

We are a permit service — we never touch a wire. A licensed electrician does every bit of the electrical work; we make sure it's permitted and inspected.

Hey — wanna know how much it'll cost you?

  • Our permit fee — priced by scope. Tony quotes it in the talk, in writing, before anything is filed.
  • City fees — at cost, set by your city and paid to your city. We never mark them up.
  • Inspection fees — set by your city and never marked up by us; overtime (after-hours) inspection, when a job needs it, is priced by the city too.
  • The electrical work itself — typical pro averages run about $1,500–$4,000 for a panel upgrade installed, and $250–$900 for a new circuit. For planning, not a quote — your electrician prices your actual job.

Just browsing? Start with the talk — the quote for our part costs nothing and takes about a minute.

Permit expediters are here to save money and save time.

The scene: the panel is maxed out, the new EV is sitting in the driveway, your electrician has Thursday open — and the permit run would eat his whole morning.

The old way

  • Your electrician burns a morning at city hall
  • Counter hours only — the job waits on a clerk
  • Work gets done first, permit chased later
  • The inspection gets booked whenever someone gets to it

The Tony way

  • Your electrician stays on the tools — we do the running
  • Talk to Tony 24/7 — permit pulled before the work starts
  • Filed same day — corrections worked right away
  • Inspection scheduled the moment the work is done
  • Filed online, even on a weekend — no waiting for Monday

Questions

Are you a contractor? Are you an installer?

No — we're permit expediters. We pull the paper: the permit, the filing, the inspection scheduling. Licensed electricians do the electrical work; we get their work permitted and signed off.Permits only — that's the whole point of us.

What is an electrical permit?

It's the city's approval that makes the electrical work legal — filed before the work, inspected after, so your home, your insurance, and a future resale all stay clean.Filed same-day; city fees separate; we never promise approval.

Can't my electrician just pull the permit?

They can — and many would rather be wiring than standing in line at city hall or fighting an online portal. We pull it for them, same day, and keep the paperwork straight across every job they run.Filed same-day; city fees separate; we never promise approval or issuance timelines.

Do I need a permit for a panel upgrade?

Yes — in virtually every city. Panel and service work is exactly what electrical permits and inspections exist for. Skipping it can haunt a home sale or an insurance claim later.Rules vary by city; we check yours before filing.

Who pays the city permit fee?

The client — homeowner or the contractor's customer — pays the city's fee directly to the city. Our fee covers the filing service only, quoted in writing before we file.Filed same-day; city fees separate; we never promise approval.

Do you do electrical work?

Never. PermitsPros is a permit service: permits, corrections, and inspection scheduling. Licensed electricians do the electrical work — that's the law and that's how it should be.Permits only — that's the whole point of us.

How fast is the permit filed?

Same day — and pulled first, before the work starts, so nobody is explaining unpermitted electrical work to an inspector after the fact.Filed same-day; city fees separate; we never promise inspection outcomes.