What this covers
- Cabinets, counters and finishes, layout intact
- Fixtures — sinks, dishwashers and ranges in place
- Flooring and tile
- Companion plumbing or electrical permits, flagged and filed with it
How it works
- Talk to Tony — tell him the address and the scope. Two minutes, from the job site.
- We prepare and file the application through PermitSF, the city's portal.
- City fees pass through at cost — you see them before anything is filed.
- When the permit issues, we line up the inspection — the sequencing is on us to track, not you.
Good to know in San Francisco
- In-kind and non-structural is San Francisco's over-the-counter class — under an hour of plan review. Move a wall or change the layout and the job files as a standard permit instead; we tell you that up front, not after.
- SF's no-plans class covers stand-alone single-family homes and pre-1991 apartment buildings.
- Condo or HOA job? Your HOA sign-off rides with the filing — we track it as part of the package.
Who uses this
Remodel contractors running kitchen work across the city, design-build firms, and homeowners hiring the remodel done right. Doing the bathroom too? See the SF bath remodel permit page.
More San Francisco permits we file
Talk to Tony — start the permit now.
Tell Tony the address and the scope, from the job site. We prepare and file it through PermitSF and line up the inspection when it issues.
Talk to TonyPermitsPros — we file permits. We never promise approvals — that's the city's call, and we tell you so up front. City fees are separate and paid by you directly to the city.
